Process: Molten Metal is injected under pressure into hardened steel dies.
- Materials poured: Aluminum, Zinc.
- Size Range: 0.1 Lb. To 15 Lbs..
- Normal Lead Times- Samples: 8-16 Weeks
- Production: 4-8 Weeks
Advantages:
- Low piece price
- Near net shape
- Good dimensional accuracy
- Reduced machining costs
- Cast thin walls
- Good surface finish
Disadvantages:
- Higher tooling costs.
- Limited alloy selection
- More prone to porosity